Tunnel wedge stability
Factor of safety of a rock wedge in the roof, the walls or the floor of a tunnel: falling or sliding, with rock bolts, shotcrete and the EN 1997 check. Close the window to see all wedges of the tunnel. Stability analyses: Tunnel wedge stability · Face wedge stability · Round length and face · Kinematic analysis · Profile from DXF · Related: Rock slope kinematics
Read from the file
- One cross-section of the excavation line: not the final lining, not the theoretical line plus overbreak.
- Drawn as one closed LWPOLYLINE (arcs as bulges are fine) or a CIRCLE. LINE + ARC chains also work when their ends meet within 1 mm.
- On a layer named EXCAVATION, or pick the layer above. Other layers are ignored.
- Units: metres, 1 drawing unit = 1 m. A file with $INSUNITS = mm, cm, inch or ft is scaled automatically.
- View: looking in the drive direction, x to the right, y up. Not mirrored.
- Tunnel axis = a POINT on layer AXIS, else the drawing origin (0, 0) when it lies inside the outline, else the centroid.
- 2D only: z is ignored. SPLINE, ELLIPSE, HATCH, TEXT and blocks are skipped: explode blocks and convert splines to polylines first.
- Optional: a horizontal LINE on layer STAGE marks the bench level (top heading above it).
Found this tool useful?
koplemo is free, with no ads and no sign-up. It is kept running by the engineers who use it.
Payment handled by Stripe. We never see your card details.
Payment handled by Stripe. You can cancel at any time; write to [email protected] if you need help.
About this tool
A wedge released by three joint sets around a tunnel either falls out of the roof or slides on one joint plane or along a line of intersection, depending on where its weight points relative to the three planes (Goodman and Shi 1985). This page analyses one wedge of the rock tunnel kinematics tool in 3D: the block is traced ray by ray to the excavation surface, the tunnel is drawn around it and the block can be moved along its failure direction to see which joint faces open and where the bolts cross it.
Rock bolts are placed as a pattern on the perimeter (spacing along the perimeter and along the axis, length, radial, vertical or custom direction, bolted arc). A bolt helps when its head lies on the wedge and it runs beyond the joint plane into the rock; its capacity is the lower of the steel or plate capacity and the bond over the anchored length (Hoek, Kaiser and Bawden 1995). Shotcrete resists along the outline of the wedge on the excavation with the lower of the adhesion to the rock (Barrett and McCreath 1995) and the plain concrete shear of SIST EN 1992-1-1:2024 clause 14.
The result is a global factor of safety against the target values of 2.0 for a falling and 1.5 for a sliding wedge, or the EN 1997-1:2004 check FoS = Rd/Ed with partial factors: a sliding wedge is a GEO limit state (partial factors on the weight, tan φ and c), a falling wedge hangs on its support and is checked as a structural limit state with γG = 1.35 on the weight, γa on the bolts and γC on the shotcrete. Joint water pressure, cohesion per plane and active or passive bolts are inputs; a cross-section with the bolts and a stereonet with the movement direction complete the view.
Why does the factor of safety of a falling wedge start at zero?
A falling wedge lifts off all three joint planes, so friction does not act and only the support holds it. Without bolts or shotcrete the resistance is zero. With support the factor of safety is the support capacity against the movement divided by the weight.
Which bolts count?
Only bolts whose head lies on the wedge and which cross a joint plane into the rock behind it. The capacity of each is the lower of the bolt capacity and the bond on the length beyond the plane, so short bolts near the apex contribute little.
Worked example
Related tools
Free to use, no sign-up. Results are for checking and preliminary design; verify them for your project. Questions or ideas: [email protected].