Convergence-confinement method: tunnel worked example
Ground reaction curve of a 9 m tunnel at 200 m depth in Mohr-Coulomb rock: critical pressure, plastic radius, shotcrete and bolts equilibrium, with hand checks.
Open this example in the tool The link loads all inputs below.
Problem
A circular tunnel of radius R = 4.5 m is driven 200 m below the surface in a weak rock mass. The support is 25 cm of shotcrete with systematic rock bolts, installed 1.5 m behind the face. Will the rock mass yield, how far will the wall converge, and how heavily is the support loaded at equilibrium?
| Tunnel radius R | 4.5 m |
| Depth H, unit weight γ, K0 | 200 m, 25 kN/m³, 1.0 (hydrostatic) |
| Rock mass (Mohr–Coulomb) | Erm = 1500 MPa, ν = 0.3, c = 0.6 MPa, φ = 26°, dilation ψ = 0° |
| Shotcrete | t = 25 cm, fc = 25 MPa, Ec = 15 GPa, νc = 0.2 |
| Rock bolts | Ø25 mm, 4 m long, 250 kN, 1.5 m × 1.5 m |
| Support installed at | L = 1.5 m behind the face |
1. In-situ stress and rock mass strength
The competence ratio σcm / p0 = 0.38 is low, so a plastic zone around the tunnel is expected.
2. Critical support pressure
Below this internal pressure the wall starts to yield (Carranza-Torres & Fairhurst, 2000):
Up to pcr the ground reaction curve is elastic. With G = E / 2(1 + ν) = 1500 / 2.6 = 577 MPa the wall moves u = R (p0 − pcr) / 2G = 4.5 · 2.73 / 1154 = 10.7 mm before yielding starts.
3. Plastic zone without support
The plastic zone would reach 4.3 m into the rock, so 4 m bolts would end inside yielded ground if the tunnel were left unsupported. The tool integrates the plastic strains for the wall displacement and gives umax = 49 mm, a strain u/R = 1.09 %: minor squeezing in the classification of Hoek & Marinos (2000).
4. Support stiffness and capacity
Shotcrete ring (Hoek & Brown, 1980; Carranza-Torres & Fairhurst, 2000):
The bolts add K ≈ 11 MPa and pmax ≈ 0.11 MPa: in this ground they are there to tie the plastic zone together rather than to carry pressure.
5. Installation and equilibrium
The longitudinal displacement profile of Vlachopoulos & Diederichs (2009), with R* = Rpl / R = 1.95, gives u / umax = 0.42 at 1.5 m behind the face, so the ground has already moved uin = 21 mm when the support goes in. From there the support curve rises with the combined stiffness until it meets the ground reaction curve:
| Hand calculation | Tool | |
|---|---|---|
| p0 | 5.00 MPa | 5.00 MPa |
| pcr | 2.27 MPa | 2.27 MPa |
| Rpl at pi = 0 | 8.8 m | 8.8 m (zone 4.3 m) |
| Shotcrete pmax / Ks | 1.35 MPa / 905 MPa | 1.35 MPa / 905 MPa |
| umax unsupported | – | 49 mm |
| Equilibrium peq / ueq | 0.75 MPa / 24 mm | 0.75 MPa / 24 mm |
| Rpl at equilibrium | – | 6.5 m (zone 2.0 m) |
Shotcrete utilisation is p / pmax = 0.55 and the bolts reach 2 m beyond the plastic zone at equilibrium, so the support works. The normal force in the lining is N = psc R ≈ 3.3 MN/m, a mean stress of 13.4 MPa in 25 cm. Installing the support closer to the face raises peq and the lining stress; installing it later lowers them but lets the plastic zone grow. The tool shows both effects at once when you change L.
In the tool you can also switch to the Hoek–Brown criterion, fit E, c and φ to a 2D FEA relaxation curve pasted from ZSoil or another program, and read the pre-relaxation factor λ to use in the 2D model.
References
- Carranza-Torres, C. & Fairhurst, C. (2000). Application of the convergence-confinement method of tunnel design to rock masses that satisfy the Hoek-Brown failure criterion. Tunnelling and Underground Space Technology 15(2), 187–213.
- Hoek, E. & Brown, E.T. (1980). Underground Excavations in Rock. Institution of Mining and Metallurgy, London.
- Hoek, E. & Marinos, P. (2000). Predicting tunnel squeezing problems in weak heterogeneous rock masses. Tunnels and Tunnelling International 32(11), 45–51.
- Vlachopoulos, N. & Diederichs, M.S. (2009). Improved longitudinal displacement profiles for convergence confinement analysis of deep tunnels. Rock Mechanics and Rock Engineering 42(2), 131–146.
Worked example by Martin Hostnik, updated 2026-11-11. Results are for checking and preliminary design; verify them for your project. Questions or a correction: [email protected].