Tunnel face wedge and face bolts (block theory): worked example

Largest wedge in a 10 m wide tunnel face by hand: joint traces, apex depth, volume, sliding on two joints (FS 0.43) and the glass fibre face bolts that hold it, with the EN 1997 check.

 Open this example in the tool The link loads all inputs below.

Problem

A heading 10 m wide and 8 m high is driven due north in blocky limestone. Two joint sets dip out of the face in a V, and a third set dips away from the face into the rock ahead. Can a wedge slide out of the face, how large can it be, and how many glass fibre face bolts hold it?

Profile10 m wide, 8 m high, drawn as a rectangle
Tunnel axisdrive direction 000°, horizontal; the face is vertical and looks south
Joint setsJ1 60° / 150°, J2 60° / 210°, J3 45° / 000°
Rockγ = 26 kN/m³, joints φ = 30°, no cohesion, dry
Face boltsglass fibre, square grid 2.5 m, L = 12 m, Tk = 200 kN, bond 100 kN/m, at least 4 m left in the rock ahead when the next set is drilled

The method is block theory for a tetrahedral wedge bounded by three joints and the face (Goodman & Shi 1985; Hoek, Kaiser & Bawden 1995, chapter 8). The tool takes the largest wedge that fits in the face, the usual assumption when the joint positions are not known. The numbers are our own case.

1. Traces on the face

The face is a vertical plane striking east-west, so each joint shows its apparent dip in the east direction, β = 090°:

J1: tan ψa = tan 60° · cos(090° − 150°) = 1.732 · 0.5 = 0.866 → 40.9°, down towards the east
J2: tan ψa = tan 60° · cos(090° − 210°) = −0.866 → 40.9°, down towards the west
J3: tan ψa = tan 45° · cos(090° − 000°) = 0 → horizontal

J1 and J2 form a V, and J3 closes it at the top. The largest such triangle that fits in a 10 m wide face is 10 m across the top with its tip 5 · 0.866 = 4.330 m lower:

footprint on the face A = ½ · 10 · 4.330 = 21.65 m²

The tool puts it where it fits, here with the tip on the invert and the top edge 4.33 m up. Where it really sits depends on where the joints cut the face.

2. Depth and volume

From the tip of the V, the line of intersection of J1 and J2 runs into the rock ahead. Its plunge and the slope of J3, both in the vertical section along the axis:

line J1 × J2: tan ψi = tan 60° · cos 30° = 1.500 → ψi = 56.31°, plunging towards 180°, out of the face
J3 dips 45° away from the face: from the top edge it drops 1.000 m per metre into the rock
apex depth d: 1.500 d = 4.330 − 1.000 d → d = 1.732 m
V = A d / 3 = 21.65 · 1.732 / 3 = 12.50 m³,   W = 26 · 12.50 = 325.0 kN

3. Sliding without support

The wedge can only move into the tunnel, along the line of intersection: it plunges at 56.3°, steeper than φ, and J3 opens as the wedge moves down and out. The two planes are symmetric about the vertical, so the normal forces on J1 and J2 are equal. With unit normals n1 = (0.433, −0.750, 0.500) and n2 = (−0.433, −0.750, 0.500) (east, north, up):

n1 · n2 = −0.1875 + 0.5625 + 0.25 = 0.625 → 51.32° between the normals, wedge angle ξ = 128.68°
wedge factor: tan φ / sin(ξ/2) = 0.5774 / 0.9014 = 0.6405
W cos ψi = 325.0 · 0.5547 = 180.3 kN (into the V),   W sin ψi = 325.0 · 0.8321 = 270.4 kN (along the line)
FS = 180.3 · 0.6405 / 270.4 = 0.43

The wedge slides as soon as the face is opened, so it needs support before the excavator takes the round.

4. Face bolts

Face bolts run horizontally into the rock ahead, parallel to the axis. On the 2.5 m grid three of them start inside the footprint, at (−2.5, 2.5), (0, 2.5) and (2.5, 2.5) m from the tip. The grid point at the tip itself lies on the outline and does not cross the wedge. Each bolt runs through the wedge for texit and then has the rest of the 4 m overlap in the rock behind it:

centre bolt at 2.5 m: it leaves the wedge where the line of intersection reaches its height, 2.5 / 1.5 = 1.667 m (J3 would be at 4.330 − 2.5 = 1.830 m). Beyond: 4 − 1.667 = 2.333 m, bond 100 · 2.333 = 233 kN > 200 kN
side bolts: J2 at x = 2.5 m is at z = 0.866 · 2.5 + 1.5 y, so it leaves at y = (2.5 − 2.165) / 1.5 = 0.223 m; 3.78 m beyond, 378 kN > 200 kN
T = 3 · 200 = 600 kN, horizontal, northwards

Split T into a part against the movement, T cos ψi, and a part that presses the wedge into the V, T sin ψi, which adds friction:

FS = [ (W cos ψi + T sin ψi) · 0.6405 + T cos ψi ] / (W sin ψi)
    = [ (180.3 + 499.2) · 0.6405 + 332.8 ] / 270.4 = (435.2 + 332.8) / 270.4 = 2.84
for FS = 1.5: T = (1.5 · 270.4 − 115.5) / (0.8321 · 0.6405 + 0.5547) = 290.1 / 1.0876 = 267 kN

Two bolts would be enough for this wedge; the grid gives three. The overlap matters more than the number: once the next rounds have cut the bolts back to about 1.7 m beyond the wedge, the centre bolt holds only 170 kN on bond, so the next set must be drilled before that.

5. EN 1997-1:2004 check

Sliding is a GEO limit state. In DA3 the weight keeps γG = 1.0 (A2), tan φ is divided by 1.25 (M2) and the bolts by γa = 1.0 (R3):

φd = arctan(0.5774 / 1.25) = 24.79°,   tan φd / sin(ξ/2) = 0.4619 / 0.9014 = 0.5124
Rd = 679.5 · 0.5124 + 332.8 = 348.2 + 332.8 = 681.0 kN,   Ed = 270.4 kN
FoS = Rd / Ed = 2.52 ≥ 1, utilisation 0.40

Result in the tool

Hand calculationToolDifference
Footprint on the face21.65 m²21.65 m²0 %
Apex depth1.732 m1.73 m0 %
Volume / weight12.50 m³ / 325.0 kN12.51 m³ / 325.1 kN+0.1 %
Mode, FS without supportslides on J1 + J2, 0.43slides on J1 + J2, 0.430 %
Face bolts3 × 200 kN3 bolts, 600 kN0 %
FS with face bolts2.842.840 %
EN 1997 DA3, FoS2.522.520 %

The tool integrates the volume over rays from the apex, which accounts for the 0.1 % on the volume. The link at the top opens the stability popup on face wedge F1, with the 3D view of the wedge and the bolts.

Your own case

  • Enter the profile as it is excavated: a pasted polyline, a horseshoe or arch template, or a DXF of the design section. For a top heading choose the top heading stage, so the face is only the heading.
  • The largest wedge is a conservative assumption. If the mapped joint traces show a smaller wedge, enter its size instead.
  • Face bolts must still reach beyond the wedge after the next rounds. Enter the overlap that is left when the next set is drilled, not the installed length.
  • For wedges in the roof and walls behind the face, the tunnel roof wedge worked example uses the same tool with radial bolts and shotcrete.

References

  • Goodman, R.E. & Shi, G. (1985). Block Theory and Its Application to Rock Engineering. Prentice-Hall, Englewood Cliffs.
  • Hoek, E., Kaiser, P.K. & Bawden, W.F. (1995). Support of Underground Excavations in Hard Rock. Balkema, Rotterdam, chapter 8.
  • Hoek, E. & Bray, J.W. (1981). Rock Slope Engineering, 3rd ed. Institution of Mining and Metallurgy, London, chapter 7 (wedge factor).
  • EN 1997-1:2004. Eurocode 7: Geotechnical design, Part 1, Annex A.

Worked example by Martin Hostnik, updated 2026-11-21. Results are for checking and preliminary design; verify them for your project. Questions or a correction: [email protected].