Tunnel roof wedge with rock bolts (block theory): worked example
Largest roof wedge of three joint sets in a 6 m flat-roofed drift: apex height, volume, bolt anchorage and shotcrete by hand, factor of safety and an EN 1997-1:2004 check.
Open this example in the tool The link loads all inputs below.
Problem
A drift 6 m wide and 5 m high, with a flat roof and vertical walls, runs due north (axis 0° / 000°). Three joint sets cut the rock. What is the largest wedge that can fall from the roof, and does a pattern of 6 m rock bolts with 100 mm of shotcrete hold it?
| Profile | 6.0 m wide × 5.0 m high, flat roof, axis horizontal towards 000° |
| Joint sets (dip / dip direction) | J1 65° / 030°, J2 70° / 150°, J3 60° / 270° |
| Rock | γ = 26 kN/m³, φ = 30° on all joints, no cohesion, dry |
| Rock bolts | pattern 1.5 × 1.5 m, radial, L = 6 m, Tk = 150 kN, bond 100 kN/m, passive (grouted) |
| Shotcrete | C25/30, t = 100 mm, adhesion 0.5 MPa over a 40 mm bond width |
| Target FS | 2.0 for a falling wedge, 1.5 for a sliding one |
The method is block theory (Goodman & Shi 1985) with the support model of Hoek, Kaiser & Bawden (1995, chapter 8). The flat roof makes every step a hand calculation. The numbers are our own case.
1. Traces on the roof
On a horizontal roof each joint leaves a trace along its strike, at 90° to its dip direction:
The three strikes are 60° apart, so the traces form an equilateral triangle. J3 runs along the tunnel, so one side of the triangle lies along a wall line and the opposite corner reaches the other wall. The largest wedge is the one whose triangle just spans the 6 m roof:
Each joint dips away from the triangle (J3 dips west from the west wall line, J1 north-east and J2 south-east from the other two sides), so the three planes lean in over the base and close above it in an apex.
2. Apex height and volume
The apex is at height h above the roof. Its plan position lies at a distance di = h cot δi from trace i, where δi is the dip of the joint. The distances from any point in a triangle to its sides satisfy Σ ai di = 2A, which gives h directly:
All three distances are positive, so the apex lies vertically above the base. Nothing holds the wedge in from below: it falls straight down and lifts off all three joints, and friction does not help. Without support the factor of safety is 0.
Area of each joint face, half the trace times the slant height di / cos δi:
3. Rock bolts
A bolt carries the wedge when its head is on the base and it reaches past the joints into stable rock. Its capacity is the smaller of the steel and the bond along the length beyond the wedge:
On a flat roof the radial bolts are vertical. The wedge is thickest at the apex, 4.26 m, so every bolt reaches at least 6 − 4.26 = 1.74 m past it: bond ≥ 100 · 1.74 = 174 kN > 150 kN. Every bolt on the base gives the full 150 kN.
A check of one bolt, with x across the tunnel (east positive, 0 on the axis) and w along the axis (0 under the apex): the apex is at x = −3 + d3 = −0.539 m, and the east corner of the triangle at (3, 0.252). For the bolt at (0, 0):
On average a 1.5 × 1.5 m pattern puts 20.78 / 2.25 = 9.2 bolts on the base. The actual count depends on where the rows fall. With the staggered pattern of the tool, 8 heads lie on the base:
| x [m] | w [m] | t [m] | L − t [m] | T [kN] |
|---|---|---|---|---|
| −0.76 | −1.5 | 1.00 | 5.00 | 150 |
| −2.26 | −1.5 | 1.28 | 4.72 | 150 |
| −1.50 | 0 | 2.60 | 3.40 | 150 |
| 0.00 | 0 | 3.52 | 2.48 | 150 |
| 1.50 | 0 | 1.46 | 4.54 | 150 |
| −2.26 | 1.5 | 1.28 | 4.72 | 150 |
| −0.76 | 1.5 | 1.71 | 4.29 | 150 |
| 0.74 | 1.5 | 0.11 | 5.89 | 150 |
| Σ | 1200 |
4. Shotcrete
The shotcrete holds the wedge along its outline on the roof, either by adhesion to the rock around it or by punching shear through the layer (Barrett & McCreath 1995). The plain concrete shear follows SIST EN 1992-1-1:2024 clause 14, with characteristic strength in the FS basis:
5. EN 1997-1:2004 check
A falling wedge hangs on its support, so the check is a structural (STR) one. The weight is a permanent unfavourable action, factored by γG = 1.35. In DA3 the bolts take γa = 1.0 (Table A.12, set R3), and the shotcrete takes γC = 1.5:
In DA1 and DA2 the bolts take γa = 1.1 (sets R1 and R2), which lowers Rd to about 1368 kN.
Result in the tool
| Hand calculation | Tool | Difference | |
|---|---|---|---|
| Base area / outline | 20.78 m² / 20.78 m | 20.8 m² / 20.8 m | 0 % |
| Apex height | 4.262 m | 4.26 m | 0 % |
| Volume / weight | 29.53 m³ / 767.8 kN | 29.53 m³ / 768 kN | 0 % |
| Area on J1 / J2 / J3 | 16.30 / 15.72 / 17.05 m² | 16.3 / 15.7 / 17.1 m² | 0 % |
| Mode, unsupported FS | falls, 0 | falls, 0.00 | |
| Bolts on the wedge / capacity | 8 / 1200 kN | 8 / 1200 kN | 0 % |
| FS bolts only / bolts + shotcrete | 1.56 / 2.10 | 1.56 / 2.10 | 0 % |
| EN 1997 DA3: Ed / Rd / FoS | 1036.5 / 1477.1 kN / 1.43 | 1036.6 / 1477.1 kN / 1.43 | 0 % |
The link at the top opens the tunnel tool with this profile and these joint sets, with the stability popup of wedge 1 already open. The 3D view shows the bolts that cross the wedge in red, and the Table button copies every bolt with its head, its length beyond the wedge and its capacity. Switch the basis to EN 1997 to see the design check.
Your own case
- Real tunnels have curved roofs. The tool traces the wedge against the actual profile (circular, horseshoe, arched, a pasted polyline or a DXF drawing), so the hand formula above is only exact for a flat roof.
- The maximum wedge is the worst case. If mapping shows shorter joints, limit the wedge by its trace length, apex height or volume.
- Check the face wedges too, and the open round before the support goes in: the same tool lists them and gives the longest safe round.
- A bolt anchors poorly where the wedge is almost as thick as the bolt is long. Keep L at least about 1.5 m longer than the apex height.
References
- Goodman, R.E. & Shi, G.-H. (1985). Block Theory and Its Application to Rock Engineering. Prentice-Hall, Englewood Cliffs.
- Hoek, E., Kaiser, P.K. & Bawden, W.F. (1995). Support of Underground Excavations in Hard Rock. Balkema, Rotterdam, chapter 8.
- Barrett, S.V.L. & McCreath, D.R. (1995). Shortcrete support design in blocky ground: towards a deterministic approach. Tunnelling and Underground Space Technology 10(1), 79–89.
- SIST EN 1992-1-1:2024, Eurocode 2: Design of concrete structures, clause 14 (plain concrete).
- EN 1997-1:2004, Eurocode 7: Geotechnical design, Part 1, Annex A.
Worked example by Martin Hostnik, updated 2026-11-21. Results are for checking and preliminary design; verify them for your project. Questions or a correction: [email protected].