Planar sliding of a rock slope: worked example

Factor of safety of a 20 m rock cut sliding on a 35° joint with a water-filled tension crack (Hoek & Bray method), by hand and with the free tool, plus rock bolts.

 Open this example in the tool The link loads all inputs below.

Problem

A 20 m high rock cut has a face dipping 60° towards 135° and a horizontal crest. A persistent joint set dips 35° in the same direction (135°), so it daylights in the face and a block can slide on it. A vertical tension crack opens 5 m behind the crest. After heavy rain the crack is half full of water. What is the factor of safety, and how much bolt force is needed for FS = 1.3?

Slope height H20 m
Face dip ψf / dip direction60° / 135°
Upper slopehorizontal (0°)
Sliding plane dip ψp / dip direction35° / 135°
Rock unit weight γ26 kN/m³
Joint strength (Mohr–Coulomb)c = 25 kPa, φ = 35°
Tension crack behind the crest b5 m, 50 % filled with water (γw = 9.81 kN/m³)

The plane strikes parallel to the face, so the two-dimensional solution of Hoek & Bray (1981) and Wyllie & Mah (2004, chapter 6) applies, per metre run of slope. The tool computes the true 3D block; with a block width B = 1 m and a plane parallel to the face it gives the same numbers.

1. Kinematics

The plane daylights (ψp = 35° < ψf = 60°), its dip direction is within ±20° of the face, and ψp is not smaller than φ = 35°. Planar sliding is kinematically possible; the joint plots on the edge of the critical zone of the Markland test.

2. Geometry of the block

Depth of the tension crack:

z = H − (b + H cot ψf) tan ψp = 20 − (5 + 20 · 0.577) · 0.700 = 20 − 11.59 = 8.41 m

Weight per metre (crack in the upper surface):

W = ½ γ H² [ (1 − (z/H)²) cot ψp − cot ψf ]
  = ½ · 26 · 20² · [ (1 − 0.177) · 1.428 − 0.577 ] = 5200 · 0.598 = 3110 kN/m

Length of the sliding surface:

A = (H − z) / sin ψp = 11.59 / 0.574 = 20.20 m²/m

3. Water forces

zw = 0.5 · 8.41 = 4.21 m
U = ½ γw zw A = ½ · 9.81 · 4.21 · 20.20 = 416.8 kN/m (uplift on the plane)
V = ½ γw zw² = ½ · 9.81 · 4.21² = 86.8 kN/m (in the tension crack)

4. Factor of safety

FS = [ c A + (W cos ψp − U − V sin ψp) tan φ ] / (W sin ψp + V cos ψp)
  = [ 25 · 20.20 + (3110 · 0.819 − 416.8 − 86.8 · 0.574) · 0.700 ] / (3110 · 0.574 + 86.8 · 0.819)
  = (505.0 + 1457.1) / (1783.8 + 71.1) = 1962.1 / 1854.9 = 1.06

With a dry crack (U = V = 0) the same block has FS = (505.0 + 2547.6 · 0.700) / 1783.8 = 1.28. Half a crack of water takes away about 17 % of the margin, which is why drainage is usually the cheapest stabilisation.

5. Rock bolts

Three rows of bolts, 150 kN each at 2 m horizontal spacing, give T = 3 · 150 / 2 = 225 kN/m. They are installed 15° below horizontal, into the slope, so they make an angle ψT + ψp = 50° with the sliding direction. As active (tensioned) bolts, they add to the normal force and reduce the driving force:

FS = [ c A + (W cos ψp − U − V sin ψp + T sin 50°) tan φ ] / (W sin ψp + V cos ψp − T cos 50°)
  = [ 505.0 + (2081.0 + 172.4) · 0.700 ] / (1854.9 − 144.6) = 2082.8 / 1710.3 = 1.22

Solving the same equation for FS = 1.3 gives the required bolt force T ≈ 327 kN/m, for example four rows of 165 kN bolts at 2 m spacing.

Result in the tool

Hand calculationTool
Weight W3110 kN/m3110 kN
Uplift U / crack water V416.8 / 86.8 kN/m417 / 87 kN
FS, half-filled crack1.061.06
FS, dry crack1.281.28
FS with 225 kN/m active bolts1.221.22
Bolt force for FS 1.3≈ 327 kN/m327 kN/m

In the tool you can switch the tension crack to Critical (minimum FS), try the Barton–Bandis criterion instead of c and φ, add a seismic coefficient, check the case with EN 1997-1 partial factors, or run the sensitivity and probabilistic tabs on φ and the water level. For a real slope use the true block width B; the tool then also accounts for a plane that does not strike exactly parallel to the face.

References

  • Hoek, E. & Bray, J.W. (1981). Rock Slope Engineering, 3rd ed. Institution of Mining and Metallurgy, London.
  • Wyllie, D.C. & Mah, C.W. (2004). Rock Slope Engineering: Civil and Mining, 4th ed. Spon Press, chapter 6.

Worked example by Martin Hostnik, updated 2026-11-11. Results are for checking and preliminary design; verify them for your project. Questions or a correction: [email protected].