Tunnel face stability (soil)

Required face pressure of slurry and EPB shields and face bolting for conventional tunnelling in soil and weak ground: wedge–prism with silo theory and seepage forces (Horn, Anagnostou–Kovári), compared with Vermeer et al., Leca–Dormieux and Broms–Bennermark. EN 1997 DA3. Shield face pressure (slurry and EPB) · Face bolting design · Rock faces with joints: Face wedge stability

Excavation
Method
Face
Dm
Bm
Hm
Wedge
Cover Cm
Surface qkPa
Ground
Behaviour
γkN/m³
γsatkN/m³
c′kPa
φ′°
cukPa
Ncrit-
K1 prism-
K2 wedge-
Groundwater
Depthm
Seepage
Head drop Δhm
Slurry: the filter cake seals the face, water pressure hydrostatic.
Open face: the face drains, seepage forces from a 3D flow field.
km/s
Drained lengthm
Shield pressure
MarginkPa
γ supportkN/m³
Water ×-
Blow-out ×σv
Operating pcrownkPa
Face bolts
Number-
Lengthm
Min. overlapm
Drill hole Ømm
Bond τkPa
Bolt TkkN
EN 1997
Basis
γφ′ / γc′
γcu-
γQ-
γa bolts-
EN 1997-1:2004 Annex A, DA3: factored ground strength, permanent actions × 1.0. Water pressures are not factored (shield: water force × factor above).
Project information
Name
Description
Design basis

Wedge–prism (Horn 1961; Anagnostou & Kovári 1994, 1996): a wedge in front of the face with an inclined slip plane at θ, loaded by a prism up to the surface. The vertical stress on the wedge follows silo theory (Janssen) with K1 and the shear on the prism sides; the side faces of the wedge carry c′ + K2σ′z tan φ′. The required support force S′(θ) comes from the equilibrium of the wedge along and normal to the slip plane; the largest over θ governs. A circular face is replaced by a square (side D or equal area), a horseshoe by its width × height. Undrained ground: total stresses with cu, φ = 0.

Seepage: steady 3D flow in homogeneous isotropic ground (finite differences, half model), water table constant (recharge), far boundaries hydrostatic, bottom impermeable, the lined tunnel behind the face impermeable. The face has the head of the chamber (EPB with a head drop) or atmospheric pressure (open face); advance drainage keeps the face head over a length ahead of the face. Seepage forces −γw∇h act on the wedge (horizontal and vertical) and, as a change of the effective unit weight, on the prism (Anagnostou & Kovári 1996). A slurry shield and a closed EPB chamber give hydrostatic water and buoyant unit weights.

Shield: the support force over the face must carry S′d plus the water force × factor; with the pressure gradient γsupport of the chamber this gives the minimum crown pressure, which is also at least the water pressure at the crown; then the margin is added (CETU 2022, DAUB 2016). The maximum is the blow-out factor × the total overburden at the crown. FoS = Rd/Ed = provided / required effective support; FoS without partial factors is the strength reduction factor at the operating pressure (without the margin).

Face bolts: bolts spread evenly over the face, each crossing the slip plane at x = z·L/H; capacity min(Tk, τπd·lfront, τπd·lbehind)/γa at the minimum overlap (front = Tk with plates). FoS = Rd/Ed is the smallest ratio of bolt force to required force over all wedges.

Checks: Vermeer, Ruse & Marcher (2002) s = γD(1/(9 tan φ′) − 0.05) − c′ cot φ′ for φ′ ≥ 20°; Leca & Dormieux (1990) kinematic upper bound with one cone, Nγ maximised numerically, cohesion by corresponding states; Broms & Bennermark (1967) σT = σv,axis − Ncritcu. These do not include seepage. EN 1997-1:2004 Annex A, DA3: γφ′ = γc′ = 1.25, γcu = 1.4, γQ = 1.3 (CETU 2022 uses the same factors on the ground strength).

About this tool

A tunnel face in soil or weak ground fails when a wedge in front of the face, loaded by the ground above it, slides into the opening. This page uses the wedge–prism model of Horn (1961) as developed by Anagnostou and Kovári (1994, 1996): the vertical load on the wedge comes from silo theory (Janssen) with the shear on the sides of the prism, the side faces of the wedge carry friction and cohesion, and the inclination of the slip plane is searched for the largest required support force.

Below the water table the page solves the steady 3D flow towards the face (finite differences) and adds the seepage forces on the wedge and the prism: an open face that drains, an EPB shield with a head drop in the chamber, or advance drainage ahead of the face. A slurry shield or a closed chamber gives hydrostatic water and buoyant weights. The section shows the head contours and the inflow through the face is estimated.

For a slurry or EPB shield the result is the pressure window at the crown, axis and invert: the minimum from the effective support and the water force with the gradient of the support medium plus a margin, and the maximum from blow-out. For conventional tunnelling the page sizes the face bolts: their number, length and overlap, with the bond on both sides of the slip plane checked at the end of each round.

The EN 1997-1 check uses Design Approach 3 (factored ground strength) and gives FoS = Rd/Ed, the utilisation and the factor of safety without partial factors. Vermeer, Ruse and Marcher (2002), the upper-bound cone of Leca and Dormieux (1990) and, for undrained clay, Broms and Bennermark (1967) are shown for comparison.

Is this tool for rock?

No. It treats the ground as a continuum (soil, weak rock, fault zones). For a jointed rock face use the face wedge stability of the rock tunnel kinematics tool, which checks wedges between joint planes.

Why is the wedge–prism pressure higher than Vermeer or Leca–Dormieux?

Limit equilibrium with silo theory is on the safe side, the upper-bound cone of Leca and Dormieux is an unsafe bound and the formula of Vermeer et al. is a fit to finite element results. The spread shows the model uncertainty; the design uses the wedge.

How much do seepage forces matter?

A lot. Flow towards an open face below the water table can double the required support. Advance drainage or a closed chamber removes most of it, which the page shows when you switch the option.