Problem

A tunnel is supported by 250 mm of steel fibre shotcrete with no bars. At the crown, the design forces from the numerical model are NEd = −1000 kN/m (compression) and MEd = 60 kNm/m. Is the lining strong enough, and what does the fibre tension add?

Sectionb = 1000 mm (per metre of tunnel), h = 250 mm, no reinforcing bars
ConcreteC30/37, γC = 1.5, ktc = 0.85, parabola-rectangle with εc2 = 2.0 ‰, εcu = 3.5 ‰
Fibressteel, class 4.0c: fR,1k = 4.0 MPa, fR,3k = 3.6 MPa; γSF = 1.5, κO = 1.0
Tension modelrigid-plastic, ultimate tensile strain εFu = 20 ‰
Design forcesNEd = −1000 kN/m, MEd = 60 kNm/m

The method is the cross-section design of fibre reinforced concrete in the fib Model Code 2020 (chapters 18 and 30). The concrete in compression follows SIST EN 1992-1-1:2024. The numbers are our own case.

1. Materials

fcd = ηcc ktc fck / γC = 1.0 · 0.85 · 30 / 1.5 = 17.0 MPa   (ηcc = (40/30)1/3 ≤ 1)
class 4.0c: fR,3k / fR,1k = 3.6 / 4.0 = 0.90, between 0.9 and 1.1 → "c"
rigid-plastic: fFtu,k = fR,3k / 3 = 1.20 MPa,   fFtu,d = κO fFtu,k / γSF = 1.20 / 1.5 = 0.800 MPa
size factor κG = 1 + 0.5 Act ≤ 1.5, Act = tension zone area in m²

The rigid-plastic law puts a constant stress fFtu,d over the whole tension zone. κG is the size factor of SIST EN 1992-1-1:2024 (L.6). The tool applies it with the fib approach as well, and you can switch it off. Per metre of lining, Act = 1.0 · (h − x).

2. Pure compression and pure tension

Nc = −fcd b h = −17.0 · 1000 · 250 = −4250 kN/m
Nt = fFtu,d κG b h = 0.800 · (1 + 0.5 · 0.25) · 1000 · 250 = 0.800 · 1.125 · 250 = 225 kN/m

Unlike plain concrete, the fibre section carries a tension force. In compression the tool caps the diagram at the minimum eccentricity e0 = max(h / 30, 20 mm) = 20 mm, which gives NRd,max = −3472 kN/m.

3. Pure bending (N = 0)

The bottom face reaches εFu = 20 ‰. The compression zone is then so shallow that the top strain εc stays below 2 ‰, on the parabola. For a top strain εc (in ‰):

x = h εc / (εc + 20),   Fc = α fcd b x with α = εc/2 − εc²/12, acting at ka x = (8 − εc) / (4 (6 − εc)) · x from the top
Ft = fFtu,d κG b (h − x), acting at the middle of the tension zone

Setting Fc = Ft takes a couple of trial values. εc = 1.0 ‰ gives Fc = 84 kN < Ft = 213 kN, and 2.0 ‰ gives 258 > 203 kN. Equilibrium is at εc = 1.714 ‰:

x = 250 · 1.714 / 21.714 = 19.74 mm,   α = 0.857 − 0.245 = 0.612,   ka = 6.286 / 17.14 = 0.367
Fc = 0.612 · 17.0 · 19.74 = 205.4 kN/m,   κG = 1 + 0.5 · 0.2303 = 1.115,   Ft = 0.800 · 1.115 · 230.3 = 205.4 kN/m ✓
lever arm = (19.74 + 230.26 / 2) − 0.367 · 19.74 = 134.87 − 7.24 = 127.6 mm
MRd,0 = 205.4 · 0.1276 = 26.2 kNm/m

The quick estimate fFtu,d κG h² / 2 = 0.800 · 1.115 · 0.25² / 2 = 27.9 kNm/m ignores the depth of the compression zone and is 6 % high.

4. Moment resistance at NEd = −1000 kN/m

With this much compression the top face reaches εcu = 3.5 ‰. The full parabola-rectangle block has α = 1 − εc2 / (3 εcu) = 0.810 and ka = 0.416. Find x from Fc − Ft = 1000 kN/m:

0.810 · 17.0 · x − 0.800 · κG · (250 − x) = 1000   →   x = 83.2 mm (κG = 1 + 0.5 · 0.1668 = 1.083)
Fc = 13.76 · 83.17 = 1144.6 kN/m,   Ft = 0.800 · 1.083 · 166.8 = 144.6 kN/m,   N = −1144.6 + 144.6 = −1000 ✓
bottom strain 3.5 · 166.8 / 83.2 = 7.0 ‰ ≤ εFu = 20 ‰ ✓
about mid-depth: MRd = 1144.6 · (125 − 0.416 · 83.17) + 144.6 · (166.59 − 125)
  = 1144.6 · 90.40 + 144.6 · 41.59 = 103.5 + 6.0 = 109.5 kNm/m

Of the 109.5 kNm/m, the fibre tension contributes 6.0 kNm/m directly. It also deepens the compression zone, because the concrete has to balance Ft as well as N.

5. Check of the design point

at constant N: MEd / MRd = 60 / 109.5 = 0.55
the tool measures along the ray from the origin through (MEd, NEd): η = 0.45, i.e. (60, −1000) × 1 / 0.45 = (133, −2224) lies on the diagram

Both measures show that the lining is adequate at the crown. The ray scales M and N together, as a load factor on one load case would.

Result in the tool

Hand calculationToolDifference
fcd / fFtu,d17.0 / 0.800 MPa17.00 / 0.800 MPa0 %
Pure compression / pure tension−4250 / 225 kN/m−4250 / 225 kN/m0 %
MRd at N = 026.2 kNm/m26.2 kNm/m0 %
MRd at N = −1000 kN/m109.5 kNm/m109.5 kNm/m0 %
NRd,max (e0 = 20 mm)–−3472 kN/m
Utilisation of the design point0.45 (ray)ηmax = 0.450 %

The link at the top opens the FRC tab of the M-N tool with this section and the design forces pasted as an Excel table, with γG set to 1.0 because they are already design values. The FRC tab asks for a password. The Diagram button copies the whole curve, so you can read MRd at any axial force.

Your own case

  • Take fR,1k and fR,3k from the beam tests of your mix (EN 14651), not from the class alone. The class only gives lower bounds.
  • Choose Linear instead of rigid-plastic for the softening law through fR,1 and fR,3, or SIST EN 1992-1-1:2024 Annex L to compare the two standards (κO is then usually 0.5).
  • For young shotcrete, enter its age t: the tool reduces fck to fck(t).
  • Paste the lining forces of a whole model from ZSoil, RS2 or DIANA, and check shear on the Shear tab.
  • Synthetic fibres need a creep factor for the residual strength, and the tool warns where a permanent lining needs more than this check.

References

  • fib (2023). fib Model Code for Concrete Structures 2020. International Federation for Structural Concrete, Lausanne, chapters 18 and 30.
  • SIST EN 1992-1-1:2024 (= EN 1992-1-1:2023). Eurocode 2: Design of concrete structures, Part 1-1, clause 5.1 and Annex L.
  • EN 14651:2005+A1:2007. Test method for metallic fibre concrete: measuring the flexural tensile strength.

Worked example by Martin Hostnik, updated 2026-11-21. Results are for checking and preliminary design; verify them for your project. Questions or a correction: [email protected].